       Bkr 14

2,200 sq.ft.

5 Bedroom

2 Bathroom

Off street parking

Total Renovation

Smart Duplex

20240525_094559.jpg

Bkr 14

Two is better than one.

AWESOME opportunity for a "house hack" individual that would like to have a piece of the American dream while building generational wealth.

Overview

INTRO

SAFE & SOUND?

DEMOLITION?

PRE-DEMOLITION WALKTHROUGH

BASEMENT

FRONT EXTERIOR

REAR EXTERIOR

MAIN LEVEL WALKTHROUGH

2ND LEVEL WALKTHROUGH

TREE REMOVAL

TECHNOLGY

MEET MY CREW

TEAR THE ROOF OFF THIS MUTHA SUCKA

Scope of  

0_WORK_TRANS copy.png

#1 Cut down 2 oak trees remove old tree trunks and bushes. Remove 2 trees in rear of house.

#2 Replace sidewalk.

#3 Replace exterior stairs with storage area under rear stairs.

#4 Repair/Reinforce porches. Install new decking.

#5 Install custom chevron railings.

#6 Replace/paint all the exterior doors.

#7 Replace windows and cover the kitchen/bathroom windows. 

#8 Conduct a lateral test.

#9 Replace gutters & downspouts.

#10 Replace/repair soffit and fascia.

#11 Replace roof with gray architectural shingles. (conditional review)

#12 New plumbing throughout.

#13 Repair chain link fence and reroute some areas.

#14 Install new light wood railroad ties retaining walls.

#15 Install 12in. modern address numbers with lighting.

#16 Excavate rear yard, demo garage, create a 3 car parking pad with loading area.

#17 Excavate the basement floor.

#18 Replace basement stairs.

#19 Replace and add structural support beams.

#20 Clean glass block/replace 3 basement window(s)

#21 Rough-In & frame out two laundry rooms. Replace interior doors. Install 2 wash boxes with drain. Install recess lighting. Install ceramic flooring.

#22 Install drywall & insulation throughout the interior/ceiling outer walls. R19 & R13

#23 Revamp interior stairs and railing with custom walls.

#24 New LVP flooring & ceramic flooring.

$25 New interior doors with modern hardware.

#26 New bathrooms: bathtub combos, vanities, fixtures, lighting, add vents/ductwork.

#27 New kitchens; close windows, install new cabinets and fixtures, new sink, dishwasher, microwave, refrigerator, gas stove (X2).

#28 Design focal wall(living room)

#29 New HVAC with central air(need new ductwork), Gas H20 tanks, New 200 amp service panels/electrical throughout (X3).

#30 New wall mounted server cabinet. High speed Cat6 ethernet cables throughout.

#31 Add trim work throughout. Paint interior walls/ceilings and exterior trim.

#32 Install tile on bathroom walls/floors and kitchen backsplash.

#33 Install Amazon smart home technology.
Smart locks, cameras, Ring doorbells, water shut-offs.

#34 Install exterior recessed lighting.

#35 Install layered security system.

#36 Install modern mailboxes

#37 Install wooden modern style rear fencing.

#38 Replace main gas line.

#39 Install modern address placards

#40 Landscape/hardscape.​​

        Tree Removal 

The Updates

Before & After

Gallery

0web_video_series ver 6.jpg
0web_video_series ver 6_NEIGHBORHOOD_UPDATE copy.png
000_BLIGHTED copy.png
000_2 copy.png
000_EXCITED copy.png

The PROCESS

Episode 1

Failure is not an option

Episode 2

We're Back Baby

Episode 3

Moving to phase 2

Episode 4
Blighted2Excited

Loving the Community 101

Demolition

CLEAN OUT: This 2,200 sq.ft. brick beauty needs a massive makeover. BUT before that can happen.  We need to demolish the entire interior of the structure so the next phase can happen.

The Contractors

After the building has been taken down to the studs. We will invite multiple contractors and subcontractors to review the scope of work. Ideally it would be very desireable to have a strong general contractor with a reliable crew of subcontractors and specialist.

The Plan

"Measure twice and cut once" is the mantra for success when doing a renovation. Our goal is to have a good map of a series of designs and floorplans with concepts. Communication is vital to get our vison to the builders and specialist involved with this project.

The Cherry on Top

Once the rough-ins,inspections,trim have been finialized. Now it's TIME to make this diamond in the rough SHINE. The tech will be installed and synced to the property. Then comes the designer with colors, materials, all types of household items that makes this building a lovely place to call home.

Bkr 14

Our goal is to be transparent and efficient.

The nifty fifty 

50 PRE DEMOLITION PHOTO GALLERY. 